Sunday, May 16, 2010

Closing Day is Friday, May 28 !!

Friday, May 14. This next week will bring a lot of changes.. The stone will be added to the front of the house on Monday & Tuesday. They will finish installing the cabinets in the kitchen, laundry/mud room, and bathrooms. The lights and fans will be installed on the inside and outside of the house. The fireplace will be tiled and the mantle will be added. The plumber is coming back to install the sinks, toilets, and appliances. Enjoy the pictures.. :)

The front. The bottom third is prepped and ready for stone.

The 2nd bathroom.

Master bedroom.. with the master bathroom cabinets ready to be installed.


The basement.



Living room.



The kitchen. The refridgerator will go on the far left. The stove and microwave will be installed in the other opening.


Another view of the kitchen.




The dishwasher will fill that empty space.


Another view of the kitchen cabinets. Hardware will be added this week too.


No comments:

Post a Comment